MCKESSON EUROPE AG
Completion
2017
Size
10.500m²
Sharing Quote
0.8
From tours, a pilot project and an ideas competition to construction site events: a lot has been done to get employees in the mood for change and to get them excited about the new concept.
The result is impressive and is reflected in the positive feedback from employees. More than 20 different work options spread over five floors and a number of other work options that exceed the number of standard workstations: All in all, there is something suitable for everyone.
-
- Basic determination & needs analysis, space & function program
- Floor plan development in various scenarios
- Entwicklung des Corporate Design „Nordic Classics“
- Development of the “Nordic Classics” corporate design
- Interior design of all special areas (reception, conference rooms,
boardroom, think tanks, lounge, cafeteria etc.) - Ideas competition & furniture tender in two phases incl. pilot project
- Product development “Strings” as room divider & design element
- User consulting & project management for the developer
- Change & relocation management
„The biggest challenge for us was to get people on board. Getting employees in a positive mood for the “Europe Plaza”, and the pilot project was particularly helpful in this respect.“
—
Annette Römer
Project manager